Oil & Gas

  • Construction of product and crude tanks in the refinery tank farm for Turkey's Star Refinery located in Aliaga, Izmir (Turkey)
  • Storage Tanks and Terminal Facilities, for OiltankingOfdjell in Sohar Oman
  • Offsites, Utilities & Storage Facilities for Naphtha Cracker Project (EPCC8), Indian Oil Corporation, Panipat, India
  • Utilities &Offsites package for IRUP project (EPCC 6A & 6B), Indian Oil Corporation, Vadodara, India
  • EPCC of Coke Drum System Package for New Coke Chambers & allied Modern Facilities for Refinery Process Plant, Indian Oil Corporation, Guwahati Refinery, India
  • Installation, Operation & Maintenance of Crude & Finished Product Tanks & Facilities on BOOT Basis for Indian Oil Corporation, Paradip, India
  • EPC of IL&FS Prime Tank Terminal FZC (IPTT) Project Phase I for IL&FS Engineering and Construction Co. Ltd. FZE, Fujairah, UAE
  • Infrastructure & Process Facilities at Top side, Inside Cavern Shaft and within Cavern on EPCC Basis for Indian Strategic Petroleum Reserves Limited (ISPRL), Vizag, India
  • Intermediate Crude Oil Terminal for Cairn India, Viramgam, India
  • EPC of Crude Oil Terminal for Cairn India, Bhogat, India
  • EPC of Common User Terminal for IOT, Raipur, India
Coming Soon
Coke Chambers 02 nos
Bridge Crane 01 nos
Pumps 10 nos
Elevators 01 nos
Static Equp. 03 Nos (02 nos. IOT Supply + 01 no. Existing)
Piping 34000 IM / 27000 ID
Piling 290 (Coke Chamber) + 88 (Pipe Rack + Pump Foundation)
Concrete 8500 cum
Structural 935 MT
Electrical Installation of MV/HV switchgear and allied cabling Jobs in existing sub station.
Instrumentation Field/Line Instrument, modification of the existing PLC and allied jobs.
Coming Soon

Power

  • Erection of boiler island and BOP packages for 2X660 MW TPP at Jharli, DistJhajjar, Haryana
  • Erection of Boiler package & ESP for unit 2&4 for 5X600 MW, Mundra TPP
  • Erection of 2X660 MW Boiler , ESP, critical piping, & STG Auxilliaries at Sasanfor Reliance Power.
  • Erection of 2X300 MW Butibori TPP of Reliance Power.
  • Fuel Oil Package for Sipat TPP, NPCIL
Coming Soon
Coming Soon
Coming Soon

Civil Works

  • Civil Works of Cement Plant for Reliance, Kundanganj, India
  • EPC of Product Warehouse of OPAL, Dahej.

Cross Country Pipelines

Location / Client Comm. Year Details Product
Barpeta Road - Shrirampur For Oil India 2007 16” dia , 115 Kms White Oil
Numaligarh - Guwahati For Oil India 2005 16” dia , 75 Kms White Oil
Goa, Own 2004 20” dia – 14 Kms White Oil, Naphtha
JNPT, Navghar, Own 1998/2003 24” & 12”- 3 lines, total 39 Km White, Black Oil
Baroda, GSPL 2003 Gas metering skids Ammonia, Steam